New construction plumbing happens in three stages that follow the building schedule. The underground stage puts the drain lines in the ground before the basement floor or slab is poured. The rough-in stage runs the drain, vent and water lines through the framing before insulation and drywall. The finish stage installs the fixtures, water heater and appliance connections once the interior is complete.
Each stage has to be ready on time for the next trade, and each is inspected by the municipal building inspector before it is covered up. Drain lines are usually tested with water or air pressure for the inspection, so leaks are found while the pipes are still exposed.
We work with custom home builders on single-family homes and with general contractors on commercial new builds. On a custom home, we can help with plumbing decisions that are hard to change later, such as where the water heater goes, whether to rough in a future basement bathroom and where the outdoor taps should be. Building a custom home or a commercial project outside our usual service area? Call to ask, since we'll consider new builds further afield.
Commercial new builds bring extra requirements, such as backflow prevention at the water service, grease interceptors for food service and accessible washroom fixtures. We carry WSIB coverage, which general contractors usually ask to see before a trade starts on site.
We go through the plans to confirm fixture locations, pipe sizes and where the water and sewer services come in.
Before the slab is poured, we install the drain lines under the floor and test them for inspection.
Once the framing is up, we run the drains, vents and water lines through the walls and floors, then test them for the rough-in inspection.
After drywall, cabinets and flooring, we set the fixtures, connect the water heater and appliances and test every line.
The building inspector checks the finished plumbing before occupancy, and any items they note are corrected.
As early as the drawings stage. Plumbing routes affect framing, beams and where ductwork can run, so conflicts are easier to solve on paper.
It depends on how the permit is set up. On many projects the plumbing contractor books the inspection for each stage, but some builders handle it themselves, so it should be agreed before work starts.
Usually a toilet drain, a shower or tub drain and a sink drain, set in the floor before the slab is poured, along with a vent connection. It costs far less to add during construction than to cut concrete later.
Drain lines are filled with water or air and held for a set time to show there are no leaks. Water supply lines are tested under pressure in the same way.
Usually, yes: larger water services, backflow prevention, grease interceptors for food service and more washroom fixtures, often including barrier-free ones designed for people using wheelchairs. These are shown on the drawings and checked at inspection.